Testpassport

 sales@testpassport.jp

下記はIBM C1000-038試験問題集は実際の試験問題のバージョンの一部です。 IBM Certified Specialist C1000-038問題集 は実際の試験問題バージョンには43問になります。すべての実際の試験問題は、勉強者が最初の試みで成功することを保証できます。C1000-038問題集の実際の試験問題でIBM試験に不合格になった場合、全額で支払い手数料の払い戻しを受けられます。実際の試験問題をトレーニングしたいでしょうか? では、トレーニングしましょう!

 C1000-038フルバージョンを入手

問題#1

Which of the following is used to consolidate host channels on an IBM z14?

A. CFSIZER tool
B. FICON Aggregation analysis
C. Fit for Purpose study
D. zBNA tool

問題#2

What can a general purpose CP on the LinuxONE Rockhopper II or Emperor II be used for?

A. IBM Db2 Analytics Accelerator (IDAA)
B. Geographically Dispersed Parallel Sysplex (GDPS)
C. Secure Service Container (SSC)
D. Dynamic Provision Manager (DPM)

問題#3

Why are IBM Db2 z/OS customers uniquely positioned to take advantage of hybrid transactional and analytical processing (HTAP)?

A. They can leverage high-value, sensitive data in a security-rich environment with the IBM Db2 Analytics Accelerator.
B. They can use IBM Open Data Analytics for z/OS to securely combine data and insight from sources other than IBM
C. They can easily scale with Db2 for z/OS Machine Learning.
D. They can use IBM Query Management Facility (QMF) to reliably optimize IBM Z data sources.

問題#4

A client is concerned about their x86 database I/O response time. Further analysis reveals significant I/O wait delay.
How is the IBM Z architecture better equipped than the x86 architecture to address this specific issue?

A. It leverages the VRIO (Vector I/O) to control I/O wait.
B. It leverages the I/O subsystem to manager I/O wait.
C. It leverages the VIO (Virtual I/O) to eliminate I/O wait.
D. It leverages zIIP processors to speed-up I/O wait.

問題#5

A client from the banking industry operates its IBM Z environment in two data centers with a database of 10 kilometers (6.2 miles). Each data center has one IBM z14 and one DS8K storage system, which are PPRC enabled.
Due to regulations, this client has the need to implement a near-continuous availability solution including long-distance disaster recovery for a new-to-build third site with a new third storage system.
Which of the following solutions satisfies the requirements?

A. GDPS Metro Global Mirror
B. GDPS Metro HyperSwap Manager
C. GDPS Metro Global C XRC
D. GDPS Global C GM

試験コード: C1000-038問題数量: 43 Q&As更新時間:  2026-10-06

  C1000-038フルバージョンを入手