Testpassport

 sales@testpassport.jp

下記はVMware 3V0-624試験問題集は実際の試験問題のバージョンの一部です。 VCAP6.5-DCV Design 3V0-624問題集 は実際の試験問題バージョンには123問になります。すべての実際の試験問題は、勉強者が最初の試みで成功することを保証できます。3V0-624問題集の実際の試験問題でVMware試験に不合格になった場合、全額で支払い手数料の払い戻しを受けられます。実際の試験問題をトレーニングしたいでしょうか? では、トレーニングしましょう!

 3V0-624フルバージョンを入手

問題#1

DRAG DROP
A company would like to utilize its current infrastructure but wants to adopt virtualization to consolidate its environment. Currently, the infrastructure contains:
• server with 2 x 8 cores CPUs and 96G8 of memory
• backup LAN with a single physical switch
• production LAN
• sufficient datastore performance as determined by the storage team
Match the existing infrastructure component to its appropriate concept.


A. 

問題#2

DRAG DROP
According to VMware-recommended best practices, on which cluster should each of the services be placed?


A. 

Explanation:
http://v-wiki.net/dedicated-management-cluster/

問題#3

A solutions architect has made the following design decisions:
• Leverage existing hardware that is certified on earlier versions of vSphere but is NOT on HCL for ESXi 6.5.
• Upgrade vCenter Server to version 6.5.
• Configure separate clusters based on ESXi versions 5.5, 6.0, and 6.5 for newly purchased, certified hardware.
• The underlying CPU family is compatible.
• There is enough resources available to vMotion virtual machines (VMs)
Given this scenario, what is the correct statement about the ability to vMotion virtual machines between versions of ESXi?

A. VMs created in vSphere 5.x must be upgraded first to newer virtual hardware and then be vMotioned to vSphere 6.x.
B. VMs created in vSphere 6.x environment with default settings can be moved to ESXi 5.x.
C. VMs can be vMotioned to the same or newer version of ESXi.
D. VMs that are created after the vCenter Server 6.5 upgrade can be vMotioned between any supported versions of ESXi.

Explanation:
https://kb.vmware.com/s/article/2007240

問題#4

A solution architect has finished conducting interviews and gathering requirements for a company, and has determined that the logical requirements are:
• two data centers for high availability
• synchronous replication to meet the zero minute RPO
• separating management workloads from application workloads
• dedicated 10Gb uplink for each low latency server
• single management point for the entire environment
Which two actions would meet the design requirements? (Choose two.)

A. Configure 1 Port Group with a dedicated 10Gb Uplink for low latency servers.
B. Deploy two clusters, one for management workloads and one for application workloads.
C. Build 2 Port Groups, one for management serves and one for application servers.
D. Install two vCenter Servers in Enhanced Link Mode.

問題#5

DRAG DROP
Sort the traffic by whether it can be encrypted natively by vSphere.


A. 

試験コード: 3V0-624問題数量: 123 Q&As更新時間:  2020-04-27

  3V0-624フルバージョンを入手